Basis Oro Valley Primary

CCA was selected to design and provide construction documents for a new 32,000 square foot school building in Oro Valley (grades 5-12). This project was designed, permitted and built on budget and on time from start to finish in an amazing 5 months.

individual-project-img1

CCA was selected to design and provide construction documents for a new 32,000 square foot school building in Oro Valley (grades 5-12). This project was designed, permitted and built on budget and on time from start to finish in an amazing 5 months.

The project featured two multipurpose spaces, a 3,000 square foot gymnasium and a 2,600 square foot cafeteria, both adjacent to a covered outdoor play area.

individual-project-img2

The cafeteria features the use of suspended acoustic panels and angled walls to control noise. It was also configured for dining use or assembly purposes with movable furniture and access to storage to change furniture layouts.

The project featured two multipurpose spaces, a 3,000 square foot gymnasium and a 2,600 square foot cafeteria, both adjacent to a covered outdoor play area.

The cafeteria features the use of suspended acoustic panels and angled walls to control noise. It was also configured for dining use or assembly purposes with movable furniture and access to storage to change furniture layouts.

The gym is adjacent and accessible to two music rooms that make back of the house and dressing room space available for performances.

individual-project-img3

The gym is adjacent and accessible to two music rooms that make back of the house and dressing room space available for performances.